RACE 2.0

Project period

-

Total budget

8,001,539 kr.

Support amount

4,660,719 kr.
Funded by
funded-by-0

About the project

Challenge

The district heating sector still has significant potential to use energy and existing infrastructure more efficiently. Data on production, distribution and consumption is often stored in separate systems, while closed vendor solutions make it difficult to share data and optimise the entire district heating system in real time.

RACE 2.0 is the successor to the RACE project, which demonstrated how real-time data, a digital twin and AI-based control can optimise heat production and distribution. RACE 2.0 takes the next step by also actively including buildings and heat consumers in the control of the system.

Solution

RACE 2.0 develops an integrated AI-based solution that connects real-time data from heat production, the district heating grid and buildings. Data from energy meters and building management systems is integrated into the digital twin, enabling AI to predict heat demand and control the system more precisely – for example through preheating, load shifting and intelligent use of buildings as thermal storage.

At the same time, the project develops new options for controlling valves and flow in different parts of the grid, as well as automatically detecting abnormal consumption patterns, faults and inefficient operation. The solution will be able to run both on-premises and in the cloud and will increasingly be based on open technologies to strengthen data security, flexibility and independence from individual vendors.

Impact / Results

The aim is to make AI-based district heating optimisation more scalable and ready for commercial use. The project targets approximately 10% annual energy savings through optimisation of production and distribution, as well as an additional 5–10% reduction in energy consumption in selected buildings through measures such as preheating and load shifting.

RACE 2.0 also aims to reduce peak loads, make better use of existing district heating infrastructure and provide utilities with a more flexible and data-driven basis for daily operations. The solution will be demonstrated at Albertslund Forsyning and Gudenådalens Energiselskab under different operating conditions.

Want to learn more?

Gitte Wad

Senior Project Manager

Aarhus+45 31 52 75 16gwa@energycluster.dk