Solution

  • The partners in Common Equipment Towers have designed and tested shared transport and storage equipment for offshore wind turbine towers.
  • The finished equipment is standardized and can be mounted on different truck brands and rented through a leasing system.
  • The new standardized solution reduces costs in the wind industry for transporting wind turbine tower sections, as the supply chain can use the same equipment to transport tower sections from different suppliers—similar to standard containers or the Euro pallet in other sectors.
  • Download the shared design

Impact

  • The innovation project has resulted in a new design that can be used for all tower sections (so-called Ø4–7) of up to 200 tonnes.
  • The new base for tower sections fits 13 different flange types. It is easy to handle and simple to manufacture, as the required welding work is minimal.
  • The design is freely available and can be used by anyone without restrictions.
“We often peak at different times, and if we can share the equipment instead of each of us having a lot of steel lying around, it will save all of us a great deal. There are opportunities in that – but it is actually also a necessity if we are to realize the potential.”

Jesper Møller

Siemens Gamesa Renewable Energy, Partner i Common Equipment Towers

Project in the media

Videos

Want to learn more?

Christian Munk Jensen

Senior Project Manager

Innovation projectsFredericia+45 50 55 26 06cmj@energycluster.dk
news-letter-logo

Sign up to our newsletter